Can Am: Time Line:

collapse time line

Sept 02

initial parts order
importing info
titling + emissions in MD

Oct 02

EPA + DOT information
Pictures from the factory
Dolly Construction

Nov 02


Finished Dolly Pictures
Pictures from the factory
Purchased some tools

Dec 02

build location
kit leaves the UK

 

Jan 03

The crate arrives
Remove Body Panels
Install alloy Panels

 

Feb 03

Paneling How To
More paneling
Panel Polishing
Rad + rad panel install.

Mar 03

Test fit pedals
Test fit steering column + rack
Engine Arrives
Fitting the Wishbones
Fitting the uprights
Steering wheel hub
Painting body panels

April 03

More painting body panels
Anodized Panel Install
Rad Pipe Install
Side Pod Install
Brake Lines Install
Steering Wheel
E-brake


May 03

Label wiring Harness
Tranny purchase
Seat install
halon system install
Passenger footrest install
Crank Pin Install
Carpet Install

June 03

Fuel + oil system diagram
Preliminary Alignment
Crank pulley/trigger install
Water pump install

July 03

Brake install
Arch vent cut out
Trans arrives
Arch vent duct

Aug 03

Engine/Trans test fit
More Arch vent duct
Trans bracket Mod
Gas tank coating
More Arch vent duct
Clutch kit install


Sept 03

Motorcycle accident
Engine/Trans final fit
Trans breather
Fit gas tanks
Trans pump
Hood / Trunk Release
Horn
Wiring harness
Battery Tie down
Side vent construction

Oct 03

More Side vent construction

Nov 03

More body painting
Dash layout
Throttle body solution
Belly pan
Dash cutting

Dec 03

body painting rethought
belly pan fitting
more dash layout

Jan 04

dash mod
fuse / relay panel
belly pan install
drivers side pod install
passenger side pod install
drivers side sill cover install
fuel surge tank

Feb 04

carbon sill covers
carbon front splitter
mount fire extinguisher
Gauge wiring
Start button

Mar 04

more carbon sill covers
Horn button
Sill Covers Mounted
SC center section
Fire wall fitting
Fire wall carpet
Fire wall heat shield
fused distribution block
more dash wiring
Wide Band 02 install
rear clip install
wireless relay install
gear linkage
Gas filler doors
Gear linkage
Test fit turbo + muffler

April 04

Gear linkage Finished
Turbo Mounting Bracket
y-pipe
Waste gate mounting
Header mock up
Drivers Side Header
Passenger Side Header
Exhaust Complete

May 04

more side vent construction
jet-hot exhaust coating


June 04

side pod seal plates
dash prefit
battery bracket install
carbon side pod done


July 04

fire bottle lines
Interior carbon fire wall
alternator bracket
front tow hook
fuel lines + pump install
more fuel lines
crank trigger + more alt bracket
ast + coolant overflow tank
e-brake handle
clutch + brake pedal

 

Aug 04

dash install
carbon firewall install
Door install
Drive Shaft install
Meth Injection
Exhaust Final install
oil cooler mount
coil mounts

Sept 04

oil cooler duct
Front lip
Fuel over flow tube

Oct 04

Intake tube
trans cooler
oil thermo
Oil filter
More Intake tube
Front end fit
Tow hook install
Trans cooler lines
oil cooler lines
methanol lines

Nov 04

trans duct
head lights
fuse panel
Head light covers
rear scoop install
jet hot intake pipe
tail lights

Dec 04

air box

Jan 05

more air box
throttle cable bracket
relocate coil packs

Feb 05

engine wiring
air filter


Mar 05

coolant
fuel pressure gauge
spark plug wires
boost controller solenoid
vacuum lines
fuel system check
modify head light housing
car starts for the first time
crank case breather
center console

April 05

more center console
Brake bias

May 05

mount rear wing
more center console
dyno runs
rear fender wells
EGT probe install
rear heat shield
fuse panel covers
rear captive nut

June 05

finished center console
rear heat shield
finished fuse panel covers
Grills
Frame damage
Exhaust trim
Rear view mirror
Starter issues

July 05

installed front air ducts
frame repair
front plate

Aug 05

stereo install
rear deck safety pin
dyno tune 2

Sept 05

wing support

Oct 05

rear tire blow out
rad mesh

Dec 05

new trans breather

Mar 06

LQ9 head swap

Apr 06

3rd dyno session

June 06

new springs
4 wheel alignment

Aug 06

Hard top

Sept 06

Primer

Nov 06

More Primer

Dec 06

Paint Progress

Jan 07

Grill Install

Feb 07

The car is complete

Mar 07

front body spacers

April 07

line lock
Remote battery jumper
Camera Mount
Drag pictues

May 08

Half shaft replacment

July 08

First road course

Aug 08

New K29R KINESIS RIMS

June 09

New Motor

collapse time line

 