Can Am: Time Line:
collapse time line
Sept 02
initial parts orderimporting infotitling + emissions in MD
Oct 02
EPA + DOT informationPictures from the factoryDolly Construction
Nov 02
Finished Dolly Pictures Pictures from the factory Purchased some tools
Dec 02
build location kit leaves the UK
Jan 03
The crate arrives Remove Body Panels Install alloy Panels
Feb 03
Paneling How To More paneling Panel Polishing Rad + rad panel install.
Mar 03
Test fit pedals Test fit steering column + rack Engine Arrives Fitting the Wishbones Fitting the uprights Steering wheel hub Painting body panels
April 03
More painting body panels Anodized Panel Install Rad Pipe Install Side Pod Install Brake Lines Install Steering Wheel E-brake
May 03
Label wiring Harness Tranny purchase Seat install halon system install Passenger footrest install Crank Pin Install Carpet Install
June 03
Fuel + oil system diagram Preliminary Alignment Crank pulley/trigger install Water pump install
July 03
Brake install Arch vent cut out Trans arrives Arch vent duct
Aug 03
Engine/Trans test fit More Arch vent duct Trans bracket Mod Gas tank coating More Arch vent duct Clutch kit install
Sept 03
Motorcycle accident Engine/Trans final fit Trans breather Fit gas tanks Trans pump Hood / Trunk Release Horn Wiring harness Battery Tie down Side vent construction
Oct 03
More Side vent construction
Nov 03
More body painting Dash layout Throttle body solution Belly pan Dash cutting
Dec 03
body painting rethought belly pan fitting more dash layout
Jan 04
dash mod fuse / relay panel belly pan install drivers side pod install passenger side pod install drivers side sill cover install fuel surge tank
Feb 04
carbon sill covers carbon front splitter mount fire extinguisher Gauge wiring Start button
Mar 04
more carbon sill covers Horn button Sill Covers Mounted SC center section Fire wall fitting Fire wall carpet Fire wall heat shield fused distribution block more dash wiring Wide Band 02 install rear clip install wireless relay install gear linkage Gas filler doors Gear linkage Test fit turbo + muffler
April 04
Gear linkage Finished Turbo Mounting Bracket y-pipe Waste gate mounting Header mock up Drivers Side Header Passenger Side Header Exhaust Complete
May 04
more side vent construction jet-hot exhaust coating
June 04
side pod seal plates dash prefit battery bracket install carbon side pod done
July 04
fire bottle lines Interior carbon fire wall alternator bracket front tow hook fuel lines + pump install more fuel lines crank trigger + more alt bracket ast + coolant overflow tank e-brake handle clutch + brake pedal
Aug 04
dash install carbon firewall install Door install Drive Shaft install Meth Injection Exhaust Final install oil cooler mount coil mounts
Sept 04
oil cooler duct Front lip Fuel over flow tube
Oct 04
Intake tube trans cooler oil thermo Oil filter More Intake tube Front end fit Tow hook install Trans cooler lines oil cooler lines methanol lines
Nov 04
trans duct head lights fuse panel Head light covers rear scoop install jet hot intake pipe tail lights
Dec 04
air box
Jan 05
more air box throttle cable bracket relocate coil packs
Feb 05
engine wiring air filter
Mar 05
coolant fuel pressure gauge spark plug wires boost controller solenoid vacuum lines fuel system check modify head light housing car starts for the first time crank case breather center console
April 05
more center console Brake bias
May 05
mount rear wing more center console dyno runs rear fender wells EGT probe install rear heat shield fuse panel covers rear captive nut
June 05
finished center console rear heat shield finished fuse panel covers Grills Frame damage Exhaust trim Rear view mirror Starter issues
July 05
installed front air ducts frame repair front plate
Aug 05
stereo install rear deck safety pin dyno tune 2
Sept 05
wing support
Oct 05
rear tire blow out rad mesh
Dec 05
new trans breather
Mar 06
LQ9 head swap
Apr 06
3rd dyno session
June 06
new springs4 wheel alignment
Aug 06
Hard top
Sept 06
Primer
Nov 06
More Primer
Dec 06
Paint Progress
Jan 07
Grill Install
Feb 07
The car is complete
Mar 07
front body spacers
April 07
line lock Remote battery jumper Camera Mount Drag pictues
May 08
Half shaft replacment
July 08
First road course
Aug 08
New K29R KINESIS RIMS
June 09
New Motor